01preppingbents
As I arrived, the crew was already prepping the bents for the crane.
Date: 07/18/2007
Views: 55
|
02prepositioning
The crane pre-positioned some timbers for easier lifts later.
Date: 07/18/2007
Views: 33
|
03removingblocking
The crew knocked away the supports and removed the spacer blocking.
Date: 07/18/2007
Views: 41
|
|
04stillcutting
Meanwhile, timber joinery was still being cut . . .
Date: 07/18/2007
Views: 34
|
05primingconnectors
. . . and the mechanical connectors were being primed.
Date: 07/18/2007
Views: 30
|
06firstbentup
The first bent (number 3) is up and temprarily joined to bent 4.
Date: 07/18/2007
Views: 38
|
|
07secondliftstart
The second lift (bent 2) is started.
Date: 07/18/2007
Views: 30
|
08persuassion
Bent 2 needs a little persuasion to cler the already lifted bent 3.
Date: 07/18/2007
Views: 27
|
09nowheretogo
Unfortuantely, they seemed to not have included the space taken by the bracing when figuring out how much room would be need to stand bent 2 next to bent 3 so that bent 1 could be lifted.
Date: 07/18/2007