west end floor start
Composite snapshot showing the start of the decking for the second floor.
Date: 09/11/2007
Views: 83
|
bedroom ceiling start
Down below the previous shot, showign the start of the ceiling for the master bedroom.
Date: 09/11/2007
Views: 25
|
scarfing
Working on the scarf joint for the beam to lie atop the central beam to make up the hight for the second floor to be laid.
Date: 10/02/2007
Views: 26
|
|
scarf 1
First half of the scarfed beam laid in place.
Date: 10/02/2007
Views: 29
|
eastinsidecomp
Composite shot of the south-east end as seen from the future stair landing.
Date: 10/02/2007
Views: 44
|
sleepers
The first of the sleepers laid. They provide the stand-off to run electrical and plumbing lines between the first floor ceiling and the second floor flooring.
Date: 10/02/2007
Views: 29
|
|
baseeastn panel
Interior framing for the east basement wall to allow the installation of the electrical panels.
Date: 10/04/2007
Views: 27
|
first corbel
The first corbel in place, filling the "ooops" mortise in the hall/bedroom beam.
Date: 10/04/2007
Views: 25
|
skylightopened
The ceiling boards have been cut out, revealing the skylight to the inside.
Date: 10/08/2007
Views: 27
|